Skip to Content

Kadena Air Base TOWER HVAC, MINI-SPLIT & DOOR REPLACEMENT

BY NOMES/ ON 24 FEB 2023

KADENA AIR BASE TOWER HVAC, MINI-SPLIT & DOOR REPLACEMENT

Installation Mini-Split and Water Heater

Our first focus will be the installation of a new multi-split type air conditioning system, which will replace the existing units and provide improved cooling and energy efficiency.

Additionally, we will be replacing the existing fire escape doors with new ones, as severe corrosion was discovered on the edges and framing of the old doors. To ensure the safety of all occupants, preparations are being made to begin abatement of any Asbestos containing material (ACM) and Lead base paint (LBP) that were detected on the doors’ hardware.

\n \n

Attention to detail and quality workmanship, and we are confident that these upgrades will significantly enhance the functionality and safety of the Bazley Tower.




Task 1. Demolition of existing ceiling board


Task 2. Removal of existing door


Task 3. Placing a concrete pad for the rooftop air handling unit

Task 4. Placing concrete pad for outdoor unit

Task 5. Removal and disposal of old HVAC equipment

Task 6. Excavation work\n\n

Task 7. Installation of individual distributed air conditioning systems

Task 8. Installation of new disconnect switch



in RMMR
MULTI-BASE RMMR INSPECTIONS: KADENA, MISAWA, YOKOTA & MORE