loto

Fuels
N.O.M.E.S Gas Station Upgrade: A Comprehensive Pipeline Replacement Project Introduction
by NOMES/ on 08 Dec 2023

N.O.M.E.S Gas Station Upgrade: A Comprehensive Pipeline Replacement Project Introduction

Understanding the Need Unraveling the Challenge The challenges faced by the gas station necessitated a revamp. Here, we explore the factors that led to the decision for such a substantial upgrade. Scope Definition A closer look at the parameters outlined by the Quality Assurance Engineer’s (QAE) request, setting the stage for the detailed scope of work undertaken by N.O.M.E.S. On-Site Assessment Engaging with the Work Environment Discover how N.O.M.E.S approached the project by conducting on-site interviews with facility workers.

Projects
Environmental control system instalation
by NOMES/ on 12 May 2023

Environmental control system instalation

Looking to upgrade your building’s energy monitoring and control system? N.O.M.E.S has got you covered. Our IT depertment recently completed the installation of new devices in the EMCS panels of multiple towers, delivering top-notch quality and expertise in the process. Each Device was thoroughly quality checked by our QCM and then shipped to Yokohama for additional modification before installation has begun. During the installation, we follow strict safety procedures including turning off the circuit breaker and performing LOTO (Lock Out Tag Out).

Fuels
Camp Foster Installing New Fueling Nozzle
by NOMES/ on 23 Mar 2023

Camp Foster Installing New Fueling Nozzle

Temporary Nozzle at the Foster gas station was successfully replaced with a new fueling nozzle. We start off the day with a daily safety meeting to ensure that the team understands safety and emergency procedures. The Lockout-Tagout (LOTO) procedure was followed to prevent the flow of any fuel during the replacement process. The team removed the temporary nozzle and then carefully drained the remaining fuel through the drain plug. After the Sealing tape was wrapped on the threads to increase adhesion at pipe joints, the team installed a new fueling nozzle.